Capacitor banks for the national electric grid

Capacitor banks for the national electric grid

In 2013, General Engineers, in teamwork with Ardan Engineering Ltd, supplied the IEC with a tailor-made integrated capacitor and reactor bank system, to improve power quality at the sub-station level.

This project integrated GE capacitors, Phoenix reactors and GE protection relays, utilizing the high-voltage electrical engineering expertise of General Engineers, together with expert Ardan design, manufacturing and integration skills. Under rigorous testing, the systems succeeded in withstanding the most severe demands of IEC quality control. This equipment will be installed in the sub-station over the next two years, in the framework of a long-term program for improving power quality.

Tags:

This is a unique website which will require a more modern browser to work! Please upgrade today!